MONTLAKE CLOSEOUT - CONTRACT DOCUMENTS REVIEW

Tracking 782 Documents | Updated October 30, 2025 at 01:18 PM

Overall Progress (Section-Weighted)
64.0%
5 of 8 sections complete
Documents Reviewed
263/782
33.6% of all documents
Review Status
518
Not Started | 1 In Progress | 263 Reviewed

Contract Documents

1. Change Orders and Supplemental Agreements
189/189 reviewed (100%) | 0 not reviewed
Change Order (189 deliverables)
  • [700] 001_WABN Plant Establishment (PCO 015) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [701] 002_Apprentice Util Plan Submittal (PCO 032) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [702] 003_Foster Island Irrg Water Supp (PCO 028) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [703] 004_Amendment to Appendix (PCO 018, 019, 020, 021, 022, 025, 026, 040) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [704] 005_RSUP Cover Plates (PCO 001) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [705] 006_Tax Rule 170-171 Graham Bid Proposal Error (PCO 010) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [706] 007_Adjust Contract Dates (PCO 067) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [707] 008_CWA Amendment 1 (PCO 063) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [708] 009_MOT Signs and Safety Drums (PCO 069, 070) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [709] 010_WABS Girder Line (PCO 038) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [710] 011_Incentive Award Program Change (PCO 078) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [711] 012_Crosswalks (PCO 084) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [712] 013_ML Fire Supp & Ltg Mods (Nine PCO's) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [713] 014_TS Controller Submittal Sheet (PCO 072) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [714] 015_Added Engineering PDW 1 (PCO 007, 039, 087) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [715] 016_Stormwater Sampling (PCO 068) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [716] 017_Environmental Update 01 (PCO 027, 030, 073, 086) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [717] 018_Field Office Water and Sewer Connection (PCO 066) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [718] 019_Storefront (PCO 056) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [719] 020_CO Located Office Change (PCO 005, 057) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [720] 021_CCMP Extension Date (PCO 029) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [721] 022_Temporary Sidewalk Reduction (PCO 064) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [722] 023_Lake Wa Blvd Closure Hrs (PCO 052) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [723] 024_WABS Time Histories (PCO 082) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [724] 025_WABS Columns (PCO 093) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [725] 026_Hard Copies and Flash Drives (PCO 017) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [726] 027_Multiple Issue Resolution No. 1 (11 PCOs - See Log) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [727] 028_Digital Signatures (PCO 034) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [728] 029_Adjust Insurance Language Chapter 1 (PCO 004) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [729] 030_Baebler and Giordano TCEs (PCO 096) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [730] 031_Cell Tower ITS Conflict (PCO 091) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [731] 032_Sign Height (PCO 111) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [732] 033_DXEI Ramp HOV Lane Closure (PCO 105) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [733] 034_Force Account Markup Change (PCO 112) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [734] 035_Electrical Conduits on Girders (PCO 117) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [735] 036_COS Interconnect on Montlake (PCO 042) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [736] 037_North Street Closure (PCO 104) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [737] 038_Addl Existing Bridge As-Builts (PCO 132) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [738] 039_ATC 001 Adjustments (PCO 125) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [739] 040_Steel Casing for 54 in. Waterline (PCO 130) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [740] 041_WABN Settlement Monitoring (PCO 119) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [741] 042_Interpretive Signs (VOIDED)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [742] 043_Guardrail on MR Line (PCO 122) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [743] 044R1_Interpretive Signs-Bus Shelters (PCO 071, 137) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [744] 045_Maturity Meters (PCO 148) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [745] 046_ML Early Use-PBB Conn Trail (PCO 076, 080) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [746] 047_76 Gas Station Debranding (PCO 126) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [747] 048_Radiographic & Mag. Part. Insp (PCO 129) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [748] 049_Conduit Re-routing (PCO 159) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [749] 050_E-Signature Change Orders (PCO 177) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [750] 051_COS Signal Pole Finishes (PCO 106) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [751] 052_Montlake Temp Market Space (PCO 077) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [752] 053_Transite in Barrier Brg Struc (PCO 134) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [753] 054_Shaft Centralizer (PCO 171) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [754] 055_54 in. Waterline North Vault (PCO 102) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [755] 056_Permeable Conc-Col Trees Impact (PCO 131, 141) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [756] 057_Luminaire Mounting WDX Tunnel (PCO 149) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [757] 058_Flexible Conduit in Pier 2 (PCO 146) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [758] 059_COVID Pre-Suspension (PCO 150) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [759] 060_COVID Closeout Certification (PCO 186) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [760] 061_NOAA Property Modifications (PCO 059) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [761] 062_LWB Pvmt Mod-Resurf. LWB & Rke (PCO 180, 192) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [762] 063_Powder Coating Materials (PCO 184) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [763] 064_COVID Suspension of Work (PCO 154) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [764] 065_Fiber Conduit-Cable Revisions (PCO 172) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [765] 066_CWA Amendment 2 (PCO 201) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [766] 067_As-Built WDs-PE Encasement (PCO 152) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [767] 068_COVID Monthly Costs for Sanit (PCO 157) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [768] 069_Roanoke Plz Re-design Pricing (PCO 203) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [769] 070_UL Ltg Nighttime Cir - Design (PCO 187) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [770] 071_ATM Sign Controllers (PCO 162) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [771] 072_PLB Structure Requirements (PCO 044) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [772] 073_PE Encase for WSDOT DI Pipe (PCO 193) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [773] 074_Reinf. Steel Working Drawings (PCO 151) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [774] 075_FB&L Fire Hydrant Clar (PCO 196) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [775] 076_Demo of Ex. Seismic Retrofit (PCO 135) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [776] 077_COVID Completion of Work (PCO 165, 190) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [777] 078_EPS Bearing (PCO 043) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [778] 079_TMS Workstation Modifications (PCO 208) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [779] 080_CAD Conformance for RFC Docs (PCO 217) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [780] 081_Uninterruptible Power Supply (PCO 169) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [781] 082_Shotcrete at RSUP Tunnel (PCO 206) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [782] 083_CSL Testing Spec Modification (PCO 221) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [783] 084_COS Cut-In Signal Loops (PCO 108) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [784] 085_Incr Cond Size at St Crossings (PCO 204) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [785] 086_Sign Brdg Repair Wknd Closure (PCO 140) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [786] 087_24th Ave Signal Ctrl Cab Parts (PCO 166) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [787] 088_SPR Lighting Service Cabinet (PCO 189) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [788] 089_LED Underlid Ltg Spare Parts (PCO 051) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [789] 090_Roanoke Plaza Re-Design Work (PCO 224) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [790] 091_Barge Requirements (PCO 232) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [791] 092_Staging Area Modification (PCO 234) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [792] 093_Remove 6 Vib Monitors on WABN (PCO 231) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [793] 094_SR 520-6A Bent 2 Demo Changes (PCO 124) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [794] 095_Signage for Flammable Cargo (PCO 222) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [795] 096_WSDOT Sign Changes (PCO 114) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [796] 097_Montlake South Const Limits (PCO 216) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [797] 098_WABS Column Core Mix Design (PCO 235) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [798] 099_SIP Forms for Tub Girders (PCO 223) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [799] 100_ML Plaza Maintenance Access (PCO 179) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [800] 101_Maint Veh Turnaround on RSUP (PCO 197) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [801] 102_Pavement Section on Maint Path (PCO 198) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [802] 103_Dowels in SW's at Lid Edges (PCO 207) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [803] 104_COVID - Sanitation Extension (PCO 236) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [804] 105_Peninsula Gate Requirements (PCO 109) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [805] 106_Elim Brdg Drg Pipe Paint Rqmt (PCO 138) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [806] 107_RSUP Tunnel Lighting (PCO 183) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [807] 108_Seattle Design Comm Workshop (PCO 209) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [808] 109_Fdn & Conduit for Fut PBB Ramp (PCO 211) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [809] 110_Temp DWXI On-Ramp at NOAA Prop (PCO 215) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [810] 111_SPU 54-inch TM Shutdown Mods (PCO 212) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [811] 112_SDOT Chan Changes on E ML PL E (PCO 239) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [812] 113_SPU PRV Conn - Design Only (PCO 173) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [813] 114_Add'l Interpretive Signage (PCO 229) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [814] 115_Elimination of CO 95 Work (PCO 247) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [815] 116_Centurylink Agreement (PCO 243) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [816] 117_Lane Closure Modifications (PCO 249) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [817] 118_FA Montlake Market Remediation (PCO 225) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [818] 119_NWR - SR 513 Comm & Htl Offers (PCO 246) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [819] 120_SPU PRS Pipe Conn - Const Only (PCO 244, 253) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [820] 121_Pier 3 Core-Test Reimbursement (PCO 240) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [821] 122_UL Ltg Nighttime Cir - Const (PCO 188) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [822] 123_Additional Camera Relocations (PCO 257) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [823] 124_BCS HMI Location (PCO 256) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [824] 125_Add'l Hotel Offers for ML Proj (PCO 248) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [825] 126_WABS Conduit Supports over 5Ft (PCO 262) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [826] 127_Elim. Environmental Incentive (PCO 268) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [827] 128_Hazardous Bldg Matls Allowance (PCO 269) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [828] 129_Landscape Mods in OCR - Design (PCO 238) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [829] 130_WABS Eqpt Pltfrm Angle Matls (PCO 273) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [830] 131_Strip Seal Replacement (PCO 002) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [831] 132_Relays & Monitoring Points (PCO 176) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [832] 133_DRB Compensation (PCO 278) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [833] 134_Landscape & Urban Des TR Revs (PCO 97, 185) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [834] 135_Express Lanes Sign Cont Wiring (PCO 266) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [835] 136_Underlid Closure Signs (PCO 288) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [836] 137_WABS Shaft Duct Clearing (PCO 284) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [837] 138_Pavt Depth for DXEI Alignment (PCO 285) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [838] 139_Correction to CO 138 (PCO 294) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [839] 140_Ethafoam Requirement (PCO 286) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [840] 141_LWB Long-Term Closure (PCO 292) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [841] 142_Mult Issue Res No. 2-2022 (PCO 182,277,279,290,291,293) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [842] 143_Multiple Issue Res No. 3-2022 (PCO 083,261,265) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [843] 144_Mult Issue Res No. 4-2022 (PCO 237,245,252,270,271,282,295)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [844] 145_Noise Threshold Mods (PCO 283) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [845] 146_WABS Deck Conc Agg Size Mod (PCO 300) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [846] 147_DXEI Ramp Shoulder Pvmt Mod (PCO 302) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [847] 148_Hamlin Alley Permanent Pole (PCO 297) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [848] 149_Balsamo Prop Dmge Claim Stlmt (PCO 307) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [849] 150_Bockus Prop Dmge Claim Stlmt (PCO 311) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [850] 151_Metro Bus Facility Spare Parts (PCO 050) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [851] 152_Subcontractor Percentages (PCO 310) Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [852] 153_MLB & LWB Extended Closures (PCO 309) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [853] 154_HMA Testing Performed by DB (PCO 314) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [854] 155_Strike-WABS Sch Recov and Time (PCO 317) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [855] 156_Lease Transfer Eastlake Office (PCO 315) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [856] 157_Eastlake Office 3rd Flr Rental (PCO 316) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [857] 158_Irrigation Controller Mods (PCO 312) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [858] 159_Additional Interpretive Signs (PCO 327) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [859] 160_LWB Sidewalk Depth (PCO 330) (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [860] 161_Independent RSUP Closure (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [861] 162_Storm Drainage Mods Bet W17&18 (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [862] 163_Truck Apron Mod at MLB & LWB (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [863] 164_Sign Bridges 2 & 3 Sign Mods Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [864] 165_Elim. Ptg of SS Gutters & D-S (Executed)
    Reviewed
    Incorporated into conformed RFP through CO 165 062302024
  • [865] 166_Landscape Modifications (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [866] 167_Underlid Luminance Test Sce (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [867] 168_SDOT Cabinet (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [868] 169_Multiple Issue Reso No. 5-2024 (Executed)
    Reviewed
    868-001: Install safety platform in Fire Flow Vault prior to Physical Completion
  • [869] 170_Multiple Issue Reso No. 6-2024 (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [870] 171_Multiple Issue Reso No. 7-2024
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [871] 172_WABS ATM VMS Extended Warranty (Executed)
    Reviewed
    872-001: Provide 3-year extended warranty for 9 ATM signs
  • [872] 173_Elec Signs Anti-Graffiti Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [873] 174_Transit Canopy Paint (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [874] 175_Topsoil Gradation (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [875] 176_PLB Girder Paint Modification (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [876] 177_City Street Long Term Closure (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [877] 178_Multiple Issue Reso No. 8-2024
    Reviewed
    002-209: Revised to reflect updated laptop screen size from 15" to 13" minimum
  • [878] 179_Transit Canopy Paint Spec (Executed)
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [879] 180_Multiple Issue Reso No. 9-2024
    Reviewed
    changes to as-built requirements, not to completion requirements
  • [880] 181_POTUS Motorcade
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [881] 182_Sign Bridge No. 4 Modifications
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [882] 183_VP Candidate Motorcade
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [883] 184_SRP Design Modifications
    Reviewed
    002-058: Added SRP deletion notation to as-built plans
  • [884] 185_Multiple Issue Reso No. 10-2025
    Reviewed
    002-058: Added cable length variance notations to as-built plans
  • [885] 186_Multiple Issue Reso No. 11-2025
    Reviewed
    002-196.9: Supply water treatment materials prior to Substantial Completion
  • [886] 187_SRP Over Ex. Swr. Mod - Const
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [887] 188_Multiple Issue Reso No. 12-2025
    Reviewed
    No relevant changes to Completion or handover requirements.
  • [888] 189_Physical Completion Added CD
    Reviewed
    001-024: Extended Physical Completion timing from 120 to 244 calendar days
2. Design-Build Contract (Contract Form)
1/1 reviewed (100%) | 0 not reviewed
Contract (1 deliverables)
  • [3] Design-Build Contract
    Reviewed
    Specific requirements for completion and closeout are stated in other documents. This agreement just references those other contract docs. One requirement pulled for betterments but it is listed under document 007.
3. WSDOT-Identified Betterments (Exhibit B)
0/1 reviewed (0%) | 1 not reviewed
Betterments (1 deliverables)
  • [7] WSDOT Identified Betterments (Exhibit B)
    In Progress
    007-001 found in Design Build Contract (003)
4. General Provisions (RFP Chapter 1)
1/1 reviewed (100%) | 0 not reviewed
General Provisions (1 deliverables)
  • [1] General Provisions (RFP Chapter 1)
    Reviewed
    Conformed through CO 165 (June 2024)
5. Community Workforce Agreement (CWA)
1/1 reviewed (100%) | 0 not reviewed
CWA (1 deliverables)
  • [4] Community Workforce Agreement
    Reviewed
    The Community Workforce Agreement contains only one completion-related requirement: notification to the Building Trades Council when Final Acceptance is received, including description of accepted work and punch list if applicable.
6. Technical Requirements (RFP Chapter 2)
1/1 reviewed (100%) | 0 not reviewed
Technical Requirements (1 deliverables)
  • [2] Technical Requirements (RFP Chapter 2)
    Reviewed
    Conformed through CO 165 (June 2024)
7. RFP Appendices (Contract Documents)
70/587 reviewed (12%) | 517 not reviewed
A - Project Files (4 deliverables)
Appendix A1 - Appendices List
Reviewed
File: Appendices List.pdf
Notes: lists all other appendices, no specific requirements
Appendix A2 - Electronic Files
Not Started
File: XL5097 Master CAD File Log A2 AD10.pdf
Appendix A4.1 - SR520 Differential Level Report
Not Started
File: SR520 Differential Level Report.pdf
Appendix A4.2 - SR520 GPS Control Network
Not Started
File: SR520 GPS Control Network.pdf
A-B - As-Built Plans and Construction (64 deliverables)
Appendix A-B1.B - WABN Construction Contract Plans
Reviewed
File: Appendix A-B1.A.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B1.B.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B1.D.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B7.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.C - WABN Isolation Bearings
Reviewed
File: Appendix A-B1.C.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.1. - WABN As-Built Plans Volume 01
Reviewed
File: Appendix A-B1.E.1.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.1.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.2. - WABN As-Built Plans Volume 02
Reviewed
File: Appendix A-B1.E.2.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.2.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.3. - WABN As-Built Plans Volume 03
Reviewed
File: Appendix A-B1.E.3.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.3.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.4. - WABN As-Built Plans Volume 04
Reviewed
File: Appendix A-B1.E.4.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.4.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.5. - WABN As-Built Plans Volume 05
Reviewed
File: Appendix A-B1.E.5.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.5.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.6. - WABN As-Built Plans Volume 06
Reviewed
File: Appendix A-B1.E.6.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.6.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.7. - WABN As-Built Plans Volume 07
Reviewed
File: Appendix A-B1.E.7.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.7.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.8. - WABN As-Built Plans Volume 08
Reviewed
File: Appendix A-B1.E.8.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.11.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.9. - WABN As-Built Plans Volume 09
Reviewed
File: Appendix A-B1.E.9.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.12.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.E.10. - WABN As-Built Plans Volume 10
Reviewed
File: Appendix A-B1.E.10.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
File: Appendix A-B2.A.13.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.F.1. - WABN RFI Log
Reviewed
File: Appendix A-B1.F.1.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.F.2. - WABN RFI Questions & Answers
Reviewed
File: Appendix A-B1.F.2.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.G.1 - WABN DCRs & IDRs Part 1
Reviewed
File: Appendix A-B1.G.1.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B1.G.2 - WABN DCRs & IDRs Part 2
Reviewed
File: Appendix A-B1.G.2.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.6 - Evergreen Point Fountains
Reviewed
File: Appendix A-B8.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.7. - FB&L As-Built Plans Volume 06a
Reviewed
File: Appendix A-B2.A.7.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.8 - FB&L As-Built Plans Volume 06b
Reviewed
File: Appendix A-B2.A.8.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.10 - FB&L As-Built Plans Volume 07a
Reviewed
File: Appendix A-B2A.10.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.14 - FB&L As-Built Plans Volume 11
Reviewed
File: Appendix A-B2.A.14.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.15 - FB&L As-Built Plans Volume 12
Reviewed
File: Appendix A-B2.A.15.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.16. - FB&L As-Built Plans Volume 13
Reviewed
File: Appendix A-B2.A.16.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.17 - FB&L As-Built Plans Volume 14a
Reviewed
File: Appendix A-B2.A.17.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.18. - FB&L As-Built Plans Volume 14b
Reviewed
File: Appendix A-B2.A.18.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.19. - FB&L As-Built Plans Volume 14c
Reviewed
File: Appendix A-B2.A.19.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.20 - FB&L As-Built Plans Volume 14d
Reviewed
File: Appendix A-B2A.20.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.21 - FB&L As-Built Plans Volume 15
Reviewed
File: Appendix A-B2.A.21.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.22. - FB&L As-Built Plans Volume 15a
Reviewed
File: Appendix A-B2.A.22.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.23. - FB&L As-Built Plans Volume 16
Reviewed
File: Appendix A-B2.A.23.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.24. - FB&L As-Built Plans Volume 17
Reviewed
File: Appendix A-B2.A.24.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.25. - FB&L As-Built Plans Volume 18
Reviewed
File: Appendix A-B2.A.25.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B2.A.26 - FB&L As-Built Plans Volume 19
Reviewed
File: Appendix A-B2.A.26.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B3.A. - WCB Disc Bearings
Reviewed
File: Appendix A-B3.A.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B3.B. - WCB As-Built
Reviewed
File: Appendix A-B3.B.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B4. - Montlake Blvd & 24th Ave Bridges
Reviewed
File: Appendix A-B4.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B5. - SR 520 Ramps Over Arboretum
Reviewed
File: Appendix A-B5.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B6. - Union Bay Bridge
Reviewed
File: Appendix A-B6.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.A. - Sound Transit ROW Plans
Reviewed
File: Appendix A-B9.A.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.B. - Sound Transit Horizontal Vertical Control
Reviewed
File: Appendix A-B9.B.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.C. - Sound Transit Tunnel Plan Profile
Reviewed
File: Appendix A-B9.C.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.D. - U220 Basis of Design Report
Reviewed
File: Appendix A-B9.D.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.E. - U220 Conformed Specifications
Reviewed
File: Appendix A-B9.E.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.F. - U220 Final Calcs Tunnels
Reviewed
File: Appendix A-B9.F.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.G. - U220 TBM Tunnels Final As-Builts
Reviewed
File: Appendix A-B9.G.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.H.1. - U220 TBM Tunnels IFC Part 1
Reviewed
File: Appendix A-B9.H.1.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.H.2. - U220 TBM Tunnels IFC Part 2
Reviewed
File: Appendix A-B9.H.2.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.I. - U220 GBR IFC
Reviewed
File: Appendix A-B9.I.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B9.J. - U220 Precast Segmental Tunnel Lining Design
Reviewed
File: Appendix A-B9.J.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B10. - Montlake Property As-Builts
Reviewed
File: Appendix A-B10.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
Appendix A-B11. - WABN Calculations
Reviewed
File: Appendix A-B11.pdf
Notes: As-built records from prior projects for reference, no specific contract requirements
B - Specifications (15 deliverables)
Appendix B1 - Amendments to Standard Specifications
Reviewed
File: Appendix B1.pdf
Notes: 4 requirements found, all tied to Physical Completion: insurance maintenance (1), environmental permit closeout (2), and temporary BMP removal (1). Document primarily contains material specifications and construction method amendments with no closeout/handover deliverables.
Appendix B2. - Standard Specifications (M 41-10)
Reviewed
File: Appendix B2.pdf
Notes: Completion requirements are incorporated into the RFP chapter 1 and 2.
Appendix B3.A. - Instructions for GSP
Reviewed
File: Appendix B3.A.pdf
Notes: The document does NOT contain actual contract requirements - it's a menu of available standard provisions for contract development.
Appendix B3.B. - General Special Provisions
Reviewed
File: Appendix B3.B.pdf
Notes: The General Special Provisions contain construction methods, materials specifications, and quality control requirements to be performed during construction. It does not contain requirements specifically tied to achieving project completion milestones or final closeout/handover activities.
Appendix B4.A. - NWR Electrical GSP Instructions
Not Started
File: Appendix B4.A.pdf
Appendix B4.B. - NWR Electrical General Special Provisions
Not Started
File: Appendix B4.B.pdf
Appendix B5.A. - NWR ITS GSP Instructions
Not Started
File: Appendix B5.A.pdf
Appendix B5.B. - NWR ITS GSP
Not Started
File: Appendix B5.B.pdf
Appendix B6.A. - NWR Landscape GSP Instructions
Not Started
File: Appendix B6.A.pdf
Appendix B6.B. - NWR Landscape GSP
Not Started
File: Appendix B6.B.pdf
Appendix B7.A. - NWR Miscellaneous GSP Instructions
Not Started
File: Appendix B7.A.pdf
Appendix B7.B. - NWR Miscellaneous GSP
Not Started
File: Appendix B7.B.pdf
Appendix B14 - Seattle Standard Specifications 2017
Not Started
File: Appendix B14.pdf
Appendix B15 - King County Metro Electrical Specification
Not Started
File: Appendix B15.pdf
Appendix B16. - Steel Escalation Cost Adjustment
Not Started
File: Appendix B16.pdf
C - Commitments List (1 deliverables)
Appendix C1. - Environmental Commitments List
Not Started
File: Appendix C1.pdf
D - Manuals (59 deliverables)
Appendix D1 - Bridge Design Manual
Not Started
File: Appendix D1.pdf
Appendix D1. - AASHTO LRFD 8th Edition 2017
Not Started
File: Appendix D34.E.pdf
Appendix D2. - Construction Manual
Not Started
File: Appendix D2.pdf
Appendix D3 - Design Manual
Not Started
File: Appendix D3.pdf
Appendix D4 - Environmental Manual
Not Started
File: Appendix D4.pdf
Appendix D5 - Geotechnical Design Manual
Not Started
File: Appendix D5.pdf
Appendix D6. - Highway Runoff Manual
Not Started
File: Appendix D6.pdf
Appendix D7. - Hydraulics Manual
Not Started
File: Appendix D7.pdf
Appendix D8. - Local Agency Guidelines
Not Started
File: Appendix D8.pdf
Appendix D9. - Maintenance Manual
Not Started
File: Appendix D9.pdf
Appendix D10. - Materials Manual
Not Started
File: Appendix D10.pdf
Appendix D11. - Pavement Surface Condition Rating Manual
Not Started
File: Appendix D11.pdf
Appendix D12. - Plans Preparation Manual
Not Started
File: Appendix D12.pdf
Appendix D13. - Organizational Conflicts of Interest Manual
Not Started
File: Appendix D13.pdf
Appendix D14. - Right of Way Manual
Not Started
File: Appendix D14.pdf
Appendix D15. - Roadside Classification Plan
Not Started
File: Appendix D15.pdf
Appendix D16. - Roadside Manual
Not Started
File: Appendix D16.pdf
Appendix D17. - Standard Plans
Not Started
File: Appendix D17.pdf
Appendix D18 - Electronic Engineering Data Standards
Not Started
File: Appendix D18.pdf
Appendix D19 - Traffic Manual
Not Started
File: Appendix D19.pdf
Appendix D20 - Utilities Accommodation Policy
Not Started
File: Appendix D20.pdf
Appendix D21. - Utilities Manual
Not Started
File: Appendix D21.pdf
Appendix D22. - Communications Manual
Not Started
File: Appendix D22.pdf
Appendix D23 - Highway Surveying Manual
Not Started
File: Appendix D23.pdf
Appendix D24 - Temporary Erosion Sediment Control Manual
Not Started
File: Appendix D24.pdf
Appendix D25 - WA MUTCD Modifications
Not Started
File: Appendix D25.pdf
Appendix D26 - Sign Fabrication Manual
Not Started
File: Appendix D26.pdf
Appendix D27 - Work Zone Traffic Control Guidelines
Not Started
File: Appendix D27.pdf
Appendix D28 - FHWA MUTCD
Not Started
File: Appendix D28.pdf
Appendix D29. - Bridge Inspection Manual
Not Started
File: Appendix D29.pdf
Appendix D30 - Seattle ROWORR
Not Started
File: Appendix D30.pdf
Appendix D31 - Seattle Standard Plans 2017
Not Started
File: Appendix D31.pdf
Appendix D33 - NWR HOV Design Guide
Not Started
File: Appendix D33.pdf
Appendix D34.A. - Wide Flange Deck Bulb Tee Girders UHPC
Not Started
File: Appendix D34.A.pdf
Appendix D34.B. - Bridge Deck Protection System
Not Started
File: Appendix D34.B.pdf
Appendix D34.C. - Bridge Design Minimum Requirements
Not Started
File: Appendix D34.C.pdf
Appendix D34.D. - Scour Requirements
Not Started
File: Appendix D34.D.pdf
Appendix D34.F - Bridge Paving Projects
Not Started
File: Appendix D34.F.pdf
Appendix D34.G - Positive Moment Strand Extension
Not Started
File: Appendix D34.G.pdf
Appendix D34.H. - Pre-Bent Stirrups Prestressed Girders
Not Started
File: Appendix D34.H.pdf
Appendix D35 - Seattle ROW Improvements Manual
Not Started
File: Appendix D35.pdf
Appendix D36 - Seattle Traffic Control Manual
Not Started
File: Appendix D36.pdf
Appendix D37 - FHWA Traffic Control Systems Handbook
Not Started
File: Appendix D37.pdf
Appendix D38. - SPU Design Standards
Not Started
File: Appendix D38.pdf
Appendix D39. - FHWA Flexibility In Highway Design
Not Started
File: Appendix D39.pdf
Appendix D40. - ET 31 ET Plus Guardrail Terminal Memo
Not Started
File: Appendix D40.pdf
Appendix D42 - NWR Area 5 Vegetation Management Plan
Not Started
File: Appendix D42.pdf
Appendix D43 - DOE Sewage Works Design Criteria
Not Started
File: Appendix D43.pdf
Appendix D44 - Seattle City Light Stock Catalog
Not Started
File: Appendix D44.pdf
Appendix D46. - King County Road Design Standards
Not Started
File: Appendix D46.pdf
Appendix D47 - DOH Water System Manual
Not Started
File: Appendix D47.pdf
Appendix D48.A - SDOT Companion Ramp Requirements
Not Started
File: Appendix D48.A.pdf
Appendix D48.B. - SDOT ADA Curb Ramp Assessment Policy
Not Started
File: Appendix D48.B.pdf
Appendix D48.C - SDOT Curb Ramp Flares-Wings Policy
Not Started
File: Appendix D48.C.pdf
Appendix D48.D - SDOT Curb Ramp Construction Tolerances
Not Started
File: Appendix D48.D.pdf
Appendix D48.E. - SDOT Curb Ramps T-Intersections
Not Started
File: Appendix D48.E.pdf
Appendix D48.F - SDOT MEF Documentation Curb Ramp
Not Started
File: Appendix D48.F.pdf
Appendix D48.G. - SDOT APS Installation Requirements
Not Started
File: Appendix D48.G.pdf
Appendix D49. - Seattle CAD Manual
Not Started
File: Appendix D49.pdf
E - Environmental (91 deliverables)
Appendix E1.A - Record of Decision
Not Started
File: Appendix E1.A.pdf
Appendix E1.AA. - NEPA-SEPA Montlake Construction Limits
Not Started
File: Appendix E1.AA.pdf
Appendix E1.B. - Final Environmental Impact Statement
Not Started
File: Appendix E1.B.pdf
Appendix E1.BB. - NEPA-SEPA Wetland Mitigation Addendum
Not Started
File: Appendix E1.BB.pdf
Appendix E1.C.1 - SEPA Public Place Designation
Not Started
File: Appendix E1.C.1.pdf
Appendix E1.C.2 - SEPA Public Place Authorization
Not Started
File: Appendix E1.C.2.pdf
Appendix E1.CC. - NEPA-SEPA Pontoon Repairs Vigor
Not Started
File: Appendix E1.CC.pdf
Appendix E1.DD. - NEPA-SEPA Pontoon Tacoma Terminal 7
Not Started
File: Appendix E1.DD.pdf
Appendix E1.FF. - NEPA-SEPA Pontoon Repairs Coffer Cell
Not Started
File: Appendix E1.FF.pdf
Appendix E1.G - NEPA-SEPA Kenmore Yard Reevaluation
Not Started
File: Appendix E1.G.pdf
Appendix E1.GG. - NEPA-SEPA WABN
Not Started
File: Appendix E1.GG.pdf
Appendix E1.H - SEPA FB&L Addendum
Not Started
File: Appendix E1.E.pdf
File: Appendix E1.H.pdf
Appendix E1.HH. - NEPA-SEPA WABN Foster Island Refinements
Not Started
File: Appendix E1.HH.pdf
Appendix E1.II. - NEPA-SEPA WABN Foster Island Design
Not Started
File: Appendix E1.II.pdf
Appendix E1.J. - NEPA-SEPA Kenmore Yard Update
Not Started
File: Appendix E1.J.pdf
File: Appendix E1.R.pdf
File: Appendix E1.V.pdf
Appendix E1.JJ. - NEPA-SEPA Tolling Equipment
Not Started
File: Appendix E1.JJ.pdf
Appendix E1.K. - NEPA-SEPA FB&L Final Design Features
Not Started
File: Appendix E1.K.pdf
Appendix E1.KK. - NEPA-SEPA Eastside Haul Routes
Not Started
File: Appendix E1.KK.pdf
Appendix E1.L. - NEPA-SEPA Westside Staging Area
Not Started
File: Appendix E1.L.pdf
Appendix E1.LL. - NEPA-SEPA Geotechnical Investigation
Not Started
File: Appendix E1.LL.pdf
Appendix E1.M. - NEPA-SEPA WCB Reevaluation
Not Started
File: Appendix E1.M.pdf
Appendix E1.MM. - NEPA-SEPA Section 106 Amendment
Not Started
File: Appendix E1.MM.pdf
Appendix E1.N. - NEPA-SEPA Floating Bridge Demolition
Not Started
File: Appendix E1.N.pdf
Appendix E1.NN. - NEPA-SEPA Tolling Equipment Installation
Not Started
File: Appendix E1.NN.pdf
Appendix E1.O - NEPA-SEPA WABS Montlake Lid
Not Started
File: Appendix E1.O.pdf
Appendix E1.OO. - NEPA-SEPA Montlake Market Closure
Not Started
File: Appendix E1.OO.pdf
Appendix E1.P. - NEPA-SEPA Pontoon Tacoma Blair Berth
Not Started
File: Appendix E1.P.pdf
Appendix E1.Q. - NEPA-SEPA FB&L Construction Changes
Not Started
File: Appendix E1.Q.pdf
Appendix E1.S. - NEPA-SEPA Eastside Staging Area
Not Started
File: Appendix E1.S.pdf
Appendix E1.T. - NEPA-SEPA Geotechnical Investigations
Not Started
File: Appendix E1.T.pdf
Appendix E1.U. - NEPA-SEPA Construction Truck Trips
Not Started
File: Appendix E1.U.pdf
Appendix E1.W. - NEPA-SEPA Additional Moorage Buoys
Not Started
File: Appendix E1.W.pdf
Appendix E1.X. - NEPA-SEPA Rescind Stormwater Changes
Not Started
File: Appendix E1.X.pdf
Appendix E1.Y. - NEPA-SEPA PATON Buoy Strings
Not Started
File: Appendix E1.Y.pdf
Appendix E1.Z. - NEPA-SEPA Channel Marker Repair
Not Started
File: Appendix E1.Z.pdf
Appendix E2. - Environmental Project Description
Not Started
File: Appendix E2.pdf
Appendix E3.A - Final Aquatic Mitigation Plan
Not Started
File: Appendix E3.A.pdf
Appendix E3.B. - Final Wetland Mitigation Report
Not Started
File: Appendix E3.B.pdf
Appendix E3.C. - Aquatic Wetland Mitigation Addendum 5
Not Started
File: Appendix E3.C.pdf
Appendix E3.D. - Permit Plans - Corps
Not Started
File: Appendix E3.D.pdf
Appendix E3.E. - Permit Plans - Seattle Shoreline
Not Started
File: Appendix E3.E.pdf
Appendix E3.F - Permit Plans - Coast Guard
Not Started
File: Appendix E3.F.pdf
Appendix E3.G - Permit Plans - WDFW Ecology
Not Started
File: Appendix E3.G.pdf
Appendix E3.H. - Wetland Aquatic Mitigation Addendum 7&4
Not Started
File: Appendix E3.H.pdf
Appendix E4.A. - Biological Assessment
Not Started
File: Appendix E4.A.pdf
Appendix E4.B. - West Approach ESA Reinitiation
Not Started
File: Appendix E4.B.pdf
Appendix E4.C. - Bubble Curtain Plans
Not Started
File: Appendix E4.C.pdf
Appendix E4.D. - Pile Driving Flow Chart
Not Started
File: Appendix E4.D.pdf
Appendix E5.A - Section 106 Programmatic Agreement
Not Started
File: Appendix E5.A.pdf
Appendix E5.B. - Section 106 Agreement Amendment 1
Not Started
File: Appendix E5.B.pdf
Appendix E6. - Unanticipated Discovery Plan
Not Started
File: Appendix E6.pdf
Appendix E7. - Historic Properties Archaeologically Sensitive Areas
Not Started
File: Appendix E7.pdf
Appendix E9. - Foster Island Treatment Plan
Not Started
File: Appendix E9.pdf
Appendix E10. - Community Construction Management Plan
Not Started
File: Appendix E10.pdf
Appendix E11. - Tree Vegetation Management Protection Plan
Not Started
File: Appendix E11.pdf
Appendix E12 - Neighborhood Traffic Management Plan
Not Started
File: Appendix E12.pdf
Appendix E14. - TESC Plan Narrative Template
Not Started
File: Appendix E14.pdf
Appendix E15 - Sustainability Performance Relationships
Not Started
File: Appendix E15.pdf
Appendix E18 - Fish Exclusion Protocols Standards
Not Started
File: Appendix E18.pdf
Appendix E19 - Recycled Concrete Aggregate PCCP
Not Started
File: Appendix E19.pdf
Appendix E20 - DOE Petroleum Remediation Guidance
Not Started
File: Appendix E20.pdf
Appendix E21. - Hazardous Materials Baseline Report
Not Started
File: Appendix E21.pdf
Appendix E22. - MTCA Exceedances WABN Geotechnical
Not Started
File: Appendix E22.pdf
Appendix E23. - Phase I ESA Montlake Gas Station
Not Started
File: Appendix E23.pdf
Appendix E24 - WABN Construction Testing Results
Not Started
File: Appendix E24.pdf
Appendix E25. - WABN Gas Monitoring Report 5
Not Started
File: Appendix E25.pdf
Appendix E26 - Environmental Constraints Plan
Not Started
File: Appendix E26.pdf
Appendix E27 - Phase II ESA Eastbound Off-Ramp
Not Started
File: Appendix E27.pdf
Appendix E28 - Hazardous Materials Report Addendum
Not Started
File: Appendix E28.pdf
Appendix E29. - Phase II ESA - Exterior
Not Started
File: Appendix E29.pdf
Appendix E31 - WABN Landfill Gas Monitoring Logs
Not Started
File: Appendix E31.pdf
Appendix E32.A. - Construction Noise Variance Decision
Not Started
File: Appendix E32.A.pdf
Appendix E32.B.1 - Montlake Phase Noise Variance Application
Not Started
File: Appendix E32.B.1.pdf
Appendix E32.B.2 - Seattle Noise Variance Application Attachment
Not Started
File: Appendix E32.B.2.pdf
Appendix E32.B.3 - Noise Variance Notification Map
Not Started
File: Appendix E32.B.3.pdf
Appendix E33. - Seattle Olmsted Park Furniture Standards
Not Started
File: Appendix E33.pdf
Appendix E34.A. - Bridge 513-10 Good Faith Survey
Not Started
File: Appendix E34.A.pdf
Appendix E34.B. - Bridge 520 3 and 3E-N Survey
Not Started
File: Appendix E34.B.pdf
Appendix E34.C. - Bridge 520-5 and 5A Survey
Not Started
File: Appendix E34.C.pdf
Appendix E34.D. - Bridges 520 6 7.5N 7.5 7.7S Survey
Not Started
File: Appendix E34.D.pdf
Appendix E34.E. - Bridge 520 6A and 6N-E Survey
Not Started
File: Appendix E34.E.pdf
Appendix E35. - FB&L Demo Test Results
Not Started
File: Appendix E35.pdf
Appendix E36. - Phase II ESA East Montlake Place
Not Started
File: Appendix E36.pdf
Appendix E36.A. - Analytical Data Lab 1805-191B
Not Started
File: Appendix E36.A.pdf
Appendix E37. - West Approach Salmonid Migration Zone
Not Started
File: Appendix E37.pdf
Appendix E38.A. - NPDES Construction Stormwater Permit
Not Started
File: Appendix E38.A.pdf
Appendix E38.B. - Administrative Order
Not Started
File: Appendix E38.B.pdf
Appendix E38.C. - Administrative Order Amendment
Not Started
File: Appendix E38.C.pdf
F - Forms (10 deliverables)
Appendix F1. - Site Inspection Form
Not Started
File: Appendix F1.pdf
Appendix F2. - Contract Bond Form
Not Started
File: Appendix F2.pdf
Appendix F3. - Report of Survey Mark Form
Not Started
File: Appendix F3.pdf
Appendix F4. - Chemical Treatment Form
Not Started
File: Appendix F4.pdf
Appendix F5.A. - DRB Administrative Procedures
Not Started
File: Appendix F5.A.pdf
Appendix F5.B - DRB State Member Scope
Not Started
File: Appendix F5B.pdf
Appendix F6 - Manufacturer Certificate Compliance Form
Not Started
File: Appendix F6.pdf
Appendix F7.A - Traffic Control Daily Report Summary
Not Started
File: Appendix F7.A.pdf
Appendix F7.B. - Traffic Control Daily Log
Not Started
File: Appendix F7.B.pdf
Appendix F8 - ROM Sample
Not Started
File: Appendix F8.pdf
G - Geotechnical (32 deliverables)
Appendix G1. - Geotechnical Baseline Report
Not Started
File: Appendix G1.pdf
Appendix G2. - Geotechnical Data Report
Not Started
File: Appendix G2.pdf
Appendix G3. - Earthquake Ground Motions Seismic Design
Not Started
File: Appendix G3.pdf
Appendix G4. - Seismic Design Technical Memorandum
Not Started
File: Appendix G4.pdf
Appendix G5. - Supplemental Preliminary Engineering Memo
Not Started
File: Appendix G5.pdf
Appendix G6 - West Approach Geologic Characterization
Not Started
File: Appendix G6.pdf
Appendix G7 - West Approach Geologic Characterization Addendum
Not Started
File: Appendix G7.pdf
Appendix G8 - Summary Previous Construction Activities
Not Started
File: Appendix G8.pdf
Appendix G9 - Revised Seismic Ground Motions
Not Started
File: Appendix G9.pdf
Appendix G10. - WABN Geotechnical Report Addendum
Not Started
File: Appendix G10.pdf
Appendix G11. - Westside Stormwater Facilities Memo
Not Started
File: Appendix G11.pdf
Appendix G12 - Westside Bike-Pedestrian Facilities Memo
Not Started
File: Appendix G12.pdf
Appendix G13 - Westside Montlake Lid Land Bridge Memo
Not Started
File: Appendix G13.pdf
Appendix G14 - WABN Geotechnical Engineering Report
Not Started
File: Appendix G14.pdf
Appendix G14.A - WABN Geotechnical Attach F App B
Not Started
File: Appendix G14.A.pdf
Appendix G14.B - WABN Geotechnical Attach F App D
Not Started
File: Appendix G14.B.pdf
Appendix G14.C - WABN Geotechnical Attach F App E
Not Started
File: Appendix G14.C.pdf
Appendix G15. - WAB South Frame 5 Soil-Structure Modeling
Not Started
File: Appendix G15.pdf
Appendix G16. - Test Pile Geotechnical Data Report
Not Started
File: Appendix G16.pdf
Appendix G17. - Existing Geotechnical Data Report
Not Started
File: Appendix G17.pdf
Appendix G18. - Geotechnical Documents Limitations
Not Started
File: Appendix G18.pdf
Appendix G19. - WCB Geotechnical Report
Not Started
File: Appendix G19.pdf
Appendix G20 - Geotechnical Data Report Addendum
Not Started
File: Appendix G20.pdf
Appendix G21.A. - West Approach Bridge Pile Driving Info
Not Started
File: Appendix G21.A.pdf
Appendix G21.B. - Union Bay Bridge Pile Driving Info
Not Started
File: Appendix G21.B.pdf
Appendix G22. - Montlake WABN Condition Survey
Not Started
File: Appendix G22.pdf
Appendix G23.A. - WABN 24th Ave Field Reports
Not Started
File: Appendix G23.A.pdf
Appendix G23.B. - WABN Change Order 44
Not Started
File: Appendix G23.B.pdf
Appendix G23.C. - WABN Construction Photos
Not Started
File: Appendix G23.C.pdf
Appendix G23.D. - WABN 24th Ave Shoring Plan
Not Started
File: Appendix G23.D.pdf
Appendix G24. - U-Link Moment-Thrust Capacity Calculations
Not Started
File: Appendix G24.pdf
Appendix G25. - Seattle Yacht Club Bulkhead Inspection
Not Started
File: Appendix G25.pdf
H - Hydraulics (11 deliverables)
Appendix H1 - Conceptual Supplemental Hydraulic Report
Not Started
File: Appendix H1.pdf
Appendix H2. - Hydraulic Report Template
Not Started
File: Appendix H2.pdf
Appendix H3 - WABN Hydraulic Report
Not Started
File: Appendix H3.pdf
Appendix H4. - FB&L As-Built Hydraulic Report
Not Started
File: Appendix H4.pdf
Appendix H5. - WABN Supplemental Hydraulic Report
Not Started
File: Appendix H5.pdf
Appendix H6 - Program Level Hydraulic Report
Not Started
File: Appendix H6.pdf
Appendix H9. - Seattle Stormwater Manual
Not Started
File: Appendix H9.pdf
Appendix H12 - Drainage Maintenance Manual Plan Sheets
Not Started
File: Appendix H12.pdf
Appendix H13 - ACPA Concrete Pipe Design Manual
Not Started
File: Appendix H13.pdf
Appendix H15. - DIPRA Ductile Iron Pipe Supports
Not Started
File: Appendix H15.pdf
Appendix H16 - SPU Client Assistance Memo 1180
Not Started
File: Appendix H16.pdf
I - Illumination, Electrical & ITS (17 deliverables)
Appendix I1. - NWR Electrical Design Practices
Not Started
File: Appendix I1.pdf
Appendix I2. - NWR Illumination Signal Details
Not Started
File: Appendix I2.pdf
Appendix I3. - NWR ITS Details
Not Started
File: Appendix I3.pdf
Appendix I4. - Power System Design
Not Started
File: Appendix I4.pdf
Appendix I5 - Illumination Design Supplement
Not Started
File: Appendix I5.pdf
Appendix I6 - AGi32 Basics Highway Lighting
Not Started
File: Appendix I6.pdf
Appendix I7 - Advanced Inspection Illumination Signal Training
Not Started
File: Appendix I7.pdf
Appendix I8. - NWR ITS Design Requirements
Not Started
File: Appendix I8.pdf
Appendix I10 - Seattle Electrical Code
Not Started
File: Appendix I10.pdf
Appendix I12. - Seattle City Light Construction Standards
Not Started
File: Appendix I12.pdf
Appendix I13. - Seattle City Light Service Connection Requirements
Not Started
File: Appendix I13.pdf
Appendix I14. - Seattle ROW Lighting Design Guidelines
Not Started
File: Appendix I14.pdf
Appendix I15. - Seattle City Light Material Standards
Not Started
File: Appendix I15.pdf
Appendix I16. - Design of Outdoor Lighting
Not Started
File: Appendix I16.pdf
Appendix I19. - SPR Electrical System Design Standard
Not Started
File: Appendix I19.pdf
Appendix I22. - Corridor Fiber Optic Communication Plan
Not Started
File: Appendix I22.pdf
Appendix I23 - Seattle City Light Service Standards
Not Started
File: Appendix I23.pdf
J - Pavement (4 deliverables)
Appendix J2. - Montlake Phase Pavement Design Report
Not Started
File: Appendix J1.pdf
File: Appendix J2.pdf
Appendix J3 - Pavement Policy
Not Started
File: Appendix J3.pdf
Appendix J4 - Pavement Project Specifications
Not Started
File: Appendix J4.pdf
K - Prevailing Wages (3 deliverables)
Appendix K2.A. - WA Prevailing Wages King County
Not Started
File: Appendix K2.A.pdf
Appendix K2.B. - Supplemental to Wages
Not Started
File: Appendix K2.B.pdf
Appendix K2.C. - Benefit Code Key
Not Started
File: Appendix K2.C.pdf
L - Landscape and Urban Design (14 deliverables)
Appendix L1. - Urban Design Exhibits
Not Started
File: Appendix L1.pdf
Appendix L2. - Seattle Design Commission Report
Not Started
File: Appendix L2.pdf
Appendix L3. - American Standard Nursery Stock
Not Started
File: Appendix L3.pdf
Appendix L4. - Landscape Maintenance Water Use Form
Not Started
File: Appendix L4.pdf
Appendix L5. - Seattle Pedestrian Wayfinding Symbols
Not Started
File: Appendix L5.pdf
Appendix L6. - Seattle Parks Technical Specifications
Not Started
File: Appendix L6.pdf
Appendix L7. - Seattle Parks Standard Details Plans
Not Started
File: Appendix L7.pdf
Appendix L8 - Seattle Parks Maintenance Utility Impact
Not Started
File: Appendix L8.pdf
Appendix L9 - Seattle Bicycle Guide Sign Practice
Not Started
File: Appendix L9.pdf
Appendix L10 - UW Irrigation Design Guide
Not Started
File: Appendix L10.pdf
Appendix L11 - Seattle Street Tree Manual
Not Started
File: Appendix L11.pdf
Appendix L12. - GCB 1895
Not Started
File: Appendix L12.pdf
Appendix L13 - Seattle Tree Replacement Executive Order
Not Started
File: Appendix L13.pdf
Appendix L14 - UW Technical Specifications
Not Started
File: Appendix L14.pdf
M - Conceptual Plans (16 deliverables)
Appendix M1 - Conceptual Plans Volume 0
Not Started
File: Appendix M1.pdf
File: Appendix M1.pdf
File: Appendix M1.pdf
Appendix M7. - WAB Pier Layouts Clearance Requirements
Not Started
File: Appendix M7.pdf
Appendix M8 - Existing Bridge Demolition Plans
Not Started
File: Appendix M8.pdf
Appendix M9 - Existing Walls to Remain Plan
Not Started
File: Appendix M9.pdf
Appendix M10 - Work Access Pile Restriction Plan
Not Started
File: Appendix M10.pdf
Appendix M11 - Future Four-Lane Plus Two HCT
Not Started
File: Appendix M11.pdf
Appendix M12. - Future Six-Lane Plus Two HCT
Not Started
File: Appendix M12.pdf
Appendix M14 - West Approach Architectural Standards
Not Started
File: Appendix M14.pdf
Appendix M15. - Sign Structure Connection Details
Not Started
File: Appendix M15.pdf
Appendix M16 - Permanent Barrier Modification Plan
Not Started
File: Appendix M16.pdf
Appendix M18 - Bascule Bridge Conceptual Plans
Not Started
File: Appendix M18.pdf
Appendix M19 - Portage Bay Bridge Conceptual Plans
Not Started
File: Appendix M19.pdf
Appendix M21. - Noxious Weed Infestation Map
Not Started
File: Appendix M21.pdf
Appendix M22. - North Transit Facility Diagram
Not Started
File: Appendix M22.pdf
N - Local Agency Agreements (4 deliverables)
Appendix N2. - Maintenance and Operation Areas
Not Started
File: Appendix N2.pdf
Appendix N3. - Seattle Design-Build Agreement
Not Started
File: Appendix N3.pdf
Appendix N4. - Street Use Permit General Conditions
Not Started
File: Appendix N4.pdf
Appendix N4.A. - Street Use Permit Special Conditions
Not Started
File: Appendix N4.A.pdf
O - Design Documentation (41 deliverables)
Appendix O1 - Design Documentation Package Checklist
Not Started
File: Appendix O1.pdf
Appendix O2 - Project File Checklist
Not Started
File: Appendix O2.pdf
Appendix O3 - Design Analysis Decision Template
Not Started
File: Appendix O3.pdf
Appendix O5.A. - PIF 1 Mageba Expansion Joints
Not Started
File: Appendix O5.A.pdf
Appendix O5.B - PIF 1 Appendices Combined
Not Started
File: Appendix O5.B.pdf
Appendix O6 - Design Parameter Template
Not Started
File: Appendix O6.pdf
Appendix O7 - Design Approval Package
Not Started
File: Appendix O7.pdf
Appendix O8.A - Design Analysis 1
Not Started
File: Appendix O8.A.pdf
Appendix O8.B. - Design Analysis 2
Not Started
File: Appendix O8.B.pdf
Appendix O8.C. - Design Analysis 3 Revisions 1
Not Started
File: Appendix O8.C.pdf
Appendix O8.D. - Design Analysis 4
Not Started
File: Appendix O8.D.pdf
Appendix O8.E. - Design Analysis 5 Revisions 1
Not Started
File: Appendix O8.E.pdf
Appendix O8.F - Design Analysis 6
Not Started
File: Appendix O8.F.pdf
Appendix O8.G. - Design Analysis 7
Not Started
File: Appendix O8.G.pdf
Appendix O8.H - Design Analysis 8
Not Started
File: Appendix O8.H.pdf
Appendix O8.I - Design Analysis 9
Not Started
File: Appendix O8.I.pdf
Appendix O8.J. - Design Analysis 10
Not Started
File: Appendix O8.J.pdf
Appendix O8.L. - Design Analysis 12
Not Started
File: Appendix O8.L.pdf
Appendix O8.M - Design Analysis 13
Not Started
File: Appendix O8.M.pdf
Appendix O9.A - Proprietary Items Memo 1
Not Started
File: Appendix O9.A.pdf
Appendix O9.B. - Proprietary Items Memo 1 Appendices
Not Started
File: Appendix O9.B.pdf
Appendix O9.C. - Proprietary Items Memo 2
Not Started
File: Appendix O9.C.pdf
Appendix O9.D. - Proprietary Items Memo 2 Appendices
Not Started
File: Appendix O9.D.pdf
Appendix O9.E. - Proprietary Items Memo 3
Not Started
File: Appendix O9.E.pdf
Appendix O9.F. - Proprietary Items Memo 3 Appendices
Not Started
File: Appendix O9.F.pdf
Appendix O9.G. - Proprietary Items Memo 4
Not Started
File: Appendix O9.G.pdf
Appendix O9.H - Proprietary Items Memo 4 Appendices
Not Started
File: Appendix O9.H.pdf
Appendix O9.I - Proprietary Items Memo 5
Not Started
File: Appendix O9.I.pdf
Appendix O9.J - Proprietary Items Memo 5 Appendices
Not Started
File: Appendix O9.J.pdf
Appendix O10 - NWR Channelization Plan Checklist
Not Started
File: Appendix O10.pdf
Appendix O11.A. - Design Decision WB Off-Ramp Montlake
Not Started
File: Appendix O11.A.pdf
Appendix O11.B - Design Decision WB Off-Ramp 24th Ave
Not Started
File: Appendix O11.B.pdf
Appendix O11.C - Design Decision WB Lane Reduction
Not Started
File: Appendix O11.C.pdf
Appendix O11.D - Design Decision 24th Ave E
Not Started
File: Appendix O11.D.pdf
Appendix O11.E. - Design Decision Direct Access Connector
Not Started
File: Appendix O11.E.pdf
Appendix O11.F. - Design Decision E Lake Washington Blvd
Not Started
File: Appendix O11.F.pdf
Appendix O12 - MEF Template
Not Started
File: Appendix O12.pdf
Appendix O13. - MEF Worksheet
Not Started
File: Appendix O13.pdf
Appendix O14.A. - State Furnished Signal Equipment Memo
Not Started
File: Appendix O14.A.pdf
Appendix O14.B. - State Furnished Signal Equipment Attachment
Not Started
File: Appendix O14.B.pdf
Appendix O15. - Contract File Index
Not Started
File: Appendix O15.pdf
P - Permits and Approvals (31 deliverables)
Appendix P1.A. - Water Quality Certification
Not Started
File: Appendix P1.A.pdf
File: Appendix P4.A.pdf
Appendix P1.B - Corps Section 404 Permit
Not Started
File: Appendix P1.pdf
Appendix P2.A. - USCG General Bridge Permit
Not Started
File: Appendix P2.A.pdf
Appendix P2.B - USCG Bridge Permit Amendment
Not Started
File: Appendix P2.B.pdf
Appendix P3 - Coastal Zone Management Consistency
Not Started
File: Appendix P3.pdf
Appendix P4.B - Water Quality Cert Amendment 1
Not Started
File: Appendix P4.B.pdf
Appendix P4.C. - Water Quality Cert Amendment 2
Not Started
File: Appendix P4.C.pdf
Appendix P4.D. - Water Quality Cert Amendment 3
Not Started
File: Appendix P4.D.pdf
Appendix P4.E - Water Quality Cert Amendment 4
Not Started
File: Appendix P4.E.pdf
Appendix P4.F. - Water Quality Cert Amendment 5
Not Started
File: Appendix P4.F.pdf
Appendix P4.G. - Water Quality Cert Amendment 6
Not Started
File: Appendix P4.G.pdf
Appendix P4.H. - Corps Permit Modification
Not Started
File: Appendix P4.H.pdf
Appendix P5. - WDFW Hydraulic Project Approval
Not Started
File: Appendix P5.pdf
Appendix P6.A. - West Approach Shoreline Development Permit
Not Started
File: Appendix P6.A.pdf
Appendix P6.B. - Seattle Master Use Permit WAB
Not Started
File: Appendix P6.B.pdf
Appendix P7.A. - NMFS Biological Opinion
Not Started
File: Appendix P7.A.pdf
Appendix P7.B. - NMFS R001
Not Started
File: Appendix P7.B.pdf
Appendix P7.C. - NMFS R002
Not Started
File: Appendix P7.C.pdf
Appendix P7.D - NMFS R003
Not Started
File: Appendix P7.D.pdf
Appendix P7.E. - NMFS R004
Not Started
File: Appendix P7.E.pdf
Appendix P7.F. - NMFS R005
Not Started
File: Appendix P7.F.pdf
Appendix P7.G. - NMFS R006
Not Started
File: Appendix P7.G.pdf
Appendix P7.H - USFWS Biological Opinion
Not Started
File: Appendix P7.H.pdf
Appendix P7.I. - USFWS R001
Not Started
File: Appendix P7.I.pdf
Appendix P7.J - USFWS R002
Not Started
File: Appendix P7.J.pdf
Appendix P7.K - USFWS R003
Not Started
File: Appendix P7.K.pdf
Appendix P7.L - USFWS R004
Not Started
File: Appendix P7.L.pdf
Appendix P7.M - USFWS R005
Not Started
File: Appendix P7.M.pdf
Appendix P7.N - USFWS R006
Not Started
File: Appendix P7.N.pdf
Appendix P7.O - USFWS R007
Not Started
File: Appendix P7.O.pdf
R - Right-of-Way (37 deliverables)
Appendix R1 - Illegal Encampments ROW
Not Started
File: Appendix R1.pdf
Appendix R2.A. - SR 520 SR 5 to Evergreen Point ROW
Not Started
File: Appendix R2.A.pdf
Appendix R2.B. - SR 520 Evergreen Point Bridge ROW
Not Started
File: Appendix R2.B.pdf
Appendix R2.C. - SR 520 Montlake to Arboretum ROW
Not Started
File: Appendix R2.C.pdf
Appendix R2.D. - SR 513 SR 520 to NE 45th ROW
Not Started
File: Appendix R2.D.pdf
Appendix R2.F. - SR 520 I-5 to Montlake ROW
Not Started
File: Appendix R2.F.pdf
Appendix R3. - Grant W-04299
Not Started
File: Appendix R3.pdf
Appendix R5.A. - WSDOT Sound Transit Airspace Lease
Not Started
File: Appendix R5.A.pdf
Appendix R5.B. - Old Canal Reserve Deed
Not Started
File: Appendix R5.B.pdf
Appendix R5.C. - Sound Transit Easement Old Canal Reserve
Not Started
File: Appendix R5.C.pdf
Appendix R5.D. - Sound Transit Easement Montlake
Not Started
File: Appendix R5.D.pdf
Appendix R5.E. - Sound Transit Light Rail Accommodation
Not Started
File: Appendix R5.E.pdf
Appendix R5.F. - SR 520 Montlake Vicinity Deed
Not Started
File: Appendix R5.F.pdf
Appendix R5.G. - Arboretum E Montlake Park Deed
Not Started
File: Appendix R5.G.pdf
Appendix R5.H - Aquatic Easement
Not Started
File: Appendix R5.H.pdf
Appendix R5.I - Aquatic Easement Amendment
Not Started
File: Appendix R5.I.pdf
Appendix R5.J. - McCurdy E Montlake Park Deed
Not Started
File: Appendix R5.J.pdf
File: Appendix R5.J.pdf
File: Appendix R5.J.pdf
Appendix R5.L - McCurdy Park Deed
Not Started
File: Appendix R5.L.pdf
Appendix R5.N - Foster Island Arboretum Deed
Not Started
File: Appendix R5.N.pdf
Appendix R5.O - Arboretum Deed
Not Started
File: Appendix R5.O.pdf
Appendix R5.P. - Foster Island Easement
Not Started
File: Appendix R5.P.pdf
Appendix R6.A - SR 5 Record of Survey
Not Started
File: Appendix R6.A.pdf
Appendix R6.B - SR 520 Record of Survey
Not Started
File: Appendix R6.B.pdf
Appendix R6.C - SR 513 Record of Survey
Not Started
File: Appendix R6.C.pdf
Appendix R6.D - SR 520 SR 5 to 513 Record of Survey
Not Started
File: Appendix R6.D.pdf
Appendix R6.E. - Section 6F Record of Survey
Not Started
File: Appendix R6.E.pdf
Appendix R7.B. - TCE Leigh
Not Started
File: Appendix R7.B.pdf
Appendix R7.B.1. - TCE Construction Memo
Not Started
File: Appendix R7.B.1.pdf
Appendix R7.F. - RUP E Montlake Park
Not Started
File: Appendix R7.F.pdf
Appendix R7.G. - RUP Washington Park Arboretum
Not Started
File: Appendix R7.G.pdf
Appendix R7.H. - RUP Washington Park Arboretum WABN
Not Started
File: Appendix R7.H.pdf
Appendix R7.I. - RUP Lake Washington Blvd
Not Started
File: Appendix R7.I.pdf
Appendix R11 - Reports Survey Marks Primary Monumentation
Not Started
File: Appendix R11.pdf
Appendix R13. - Staging Areas Exhibit
Not Started
File: Appendix R13.pdf
Appendix R14 - State Sales Tax Rule 170 171 Map
Not Started
File: Appendix R14.pdf
S - Structures (12 deliverables)
Appendix S1. - Design Criteria Essential Bridges
Not Started
File: Appendix S1.pdf
Appendix S2. - Seismic Design Criteria Lid Bridges
Not Started
File: Appendix S2.pdf
Appendix S3. - Bridges Light Rail Transit Loading Criteria
Not Started
File: Appendix S3.pdf
Appendix S4. - Sound Transit Design Criteria Manual
Not Started
File: Appendix S4.pdf
Appendix S5. - Seismic Isolation Design Criteria
Not Started
File: Appendix S5.pdf
Appendix S6. - Vessel Collision Data
Not Started
File: Appendix S6.pdf
Appendix S7 - Light Rail Ready White Paper
Not Started
File: Appendix S7.pdf
Appendix S8 - WABN Global Analysis Summary
Not Started
File: Appendix S8.pdf
Appendix S9 - Underwater Sound Levels Pile Driving
Not Started
File: Appendix S9.pdf
Appendix S10 - USCG Bridge Permit Application Guide
Not Started
File: Appendix S10.pdf
Appendix S11 - Structures Project Specifications
Not Started
File: Appendix S11.pdf
Appendix S12. - Existing Structural Elements Requirements
Not Started
File: Appendix S12.pdf
T - Traffic (34 deliverables)
Appendix T1. - Interchange Justification Report
Not Started
File: Appendix T1.pdf
Appendix T2. - MicroSimulation Guidelines
Not Started
File: Appendix T2.pdf
Appendix T4. - Approved Traffic Signal Permits
Not Started
File: Appendix T4.pdf
Appendix T5 - Speed Limit Reductions Work Zones
Not Started
File: Appendix T5.pdf
Appendix T6. - Work Zone Safety and Mobility
Not Started
File: Appendix T6.pdf
Appendix T7. - WSP Traffic Control Assistance
Not Started
File: Appendix T7.pdf
Appendix T8. - Signal Turn-On Checklist
Not Started
File: Appendix T8.pdf
Appendix T9 - NCHRP Report 350
Not Started
File: Appendix T9.pdf
Appendix T10 - FHWA TMP Work Zones
Not Started
File: Appendix T10.pdf
Appendix T12 - NWR Sign Design Practices Manual
Not Started
File: Appendix T12.pdf
Appendix T13. - NWR Traffic Operations Redbook
Not Started
File: Appendix T13.pdf
Appendix T14. - NWR Signing Current Practices
Not Started
File: Appendix T14.pdf
Appendix T15. - SIDRA Policy Settings
Not Started
File: Appendix T15.pdf
Appendix T17 - SDOT VISSIM SCOOT Deployment Memo
Not Started
File: Appendix T17.pdf
Appendix T18. - King County Metro ITS Requirements
Not Started
File: Appendix T18.pdf
Appendix T19 - SDOT Pedestrian Mobility Work Zones
Not Started
File: Appendix T19.pdf
Appendix T20. - SDOT Discretionary Guide Signs
Not Started
File: Appendix T20.pdf
Appendix T22. - State Force Work Memo 1
Not Started
File: Appendix T22.pdf
Appendix T23 - State Force Work Memo 2
Not Started
File: Appendix T23.pdf
Appendix T24 - SDOT Sign Catalog
Not Started
File: Appendix T24.pdf
Appendix T25 - Signing Inventory Form
Not Started
File: Appendix T25.pdf
Appendix T26.A - VISSIM Confidence Calibration AM
Not Started
File: Appendix T26.A.1.pdf
File: Appendix T26.A.2.pdf
File: Appendix T26.A.3.pdf
Appendix T26.B - VISSIM Montlake Phase AM
Not Started
File: Appendix T26.B.1.pdf
File: Appendix T26.B.2.pdf
File: Appendix T26.B.3.pdf
Appendix T26.C.1. - VISSIM Preferred Alternative AM
Not Started
File: Appendix T26.C.1.pdf
Appendix T26.C.2. - VISSIM Preferred Alternative Mid
Not Started
File: Appendix T26.C.2.pdf
Appendix T26.C.3. - VISSIM Preferred Alternative PM
Not Started
File: Appendix T26.C.3.pdf
Appendix T27. - Montlake Phase Traffic Operations Report
Not Started
File: Appendix T27.pdf
Appendix T28. - Preferred Alternative Traffic Operations Report
Not Started
File: Appendix T28.pdf
Appendix T29. - VISSIM Confidence Calibration Report
Not Started
File: Appendix T29.pdf
Appendix T30. - WSDOT VISSIM Protocol
Not Started
File: Appendix T30.pdf
TF - Transit Facilities (6 deliverables)
Appendix TF2. - Metro Transportation Facility Design Guidelines
Not Started
File: Appendix TF2.pdf
Appendix TF3.A. - Metro Transit Passenger Facility Architectural
Not Started
File: Appendix TF3.A.pdf
File: Appendix TF3.A.pdf
Appendix TF3.B. - Metro Transit Passenger Facility Details
Not Started
File: Appendix TF3.B.pdf
Appendix TF4. - Metro Transit Trolley Overhead Standards
Not Started
File: Appendix TF4.pdf
Appendix TF5. - Metro Transit Signing Standards Manual
Not Started
File: Appendix TF5.pdf
U - Utilities (68 deliverables)
Appendix U1.A - CenturyLink Fiber Optic As-Built
Not Started
File: Appendix U1.A.pdf
Appendix U1.B - Comcast Cable Television As-Built
Not Started
File: Appendix U1.B.pdf
Appendix U1.C.1 - R2016 GM381 Utility Agreement
Not Started
File: Appendix U1.C.1.pdf
Appendix U1.C.2. - R2016 SAS 5573 Utility Agreement
Not Started
File: Appendix U1.C.2.pdf
Appendix U1.C.3. - R2016 SAU 5571 Utility Agreement
Not Started
File: Appendix U1.C.3.pdf
Appendix U1.C.4. - R2016 SAU 5572 Utility Agreement
Not Started
File: Appendix U1.C.4.pdf
Appendix U1.C.5. - R2016 SAU 5574 Utility Agreement
Not Started
File: Appendix U1.C.5.pdf
Appendix U1.C.6. - R2016 SAU 5595 Utility Agreement
Not Started
File: Appendix U1.C.6.pdf
Appendix U1.C.7 - R2016 SAU 5596 Utility Agreement
Not Started
File: Appendix U1.C.7.pdf
Appendix U1.C.8 - R2016 SUA 645-S2 647-S1
Not Started
File: Appendix U1.C.8.pdf
Appendix U1.C.9 - R2016 SUA 657 Sup1
Not Started
File: Appendix U1.C.9.pdf
Appendix U1.C.10 - R2016 SUA 658 5594
Not Started
File: Appendix U1.C.10.pdf
Appendix U1.C.11 - R2016 SUA 658 Sup1
Not Started
File: Appendix U1.C.11.pdf
Appendix U1.C.12 - R2016 SUA 658 Sup2
Not Started
File: Appendix U1.C.12.pdf
Appendix U1.C.13 - R2016 UTB1141 Utility Agreement
Not Started
File: Appendix U1.C.13.pdf
Appendix U1.C.14 - R2016 UTB1169 Utility Agreement
Not Started
File: Appendix U1.C.14.pdf
Appendix U1.C.15 - R2016 UTB1170 Utility Agreement
Not Started
File: Appendix U1.C.15.pdf
Appendix U1.C.16 - R2016 Westside SUA Locations
Not Started
File: Appendix U1.C.16.pdf
Appendix U1.C.17. - SAU 5690 Utility Agreement
Not Started
File: Appendix U1.C.17.pdf
Appendix U1.C.18. - SAU 5691 Utility Agreement
Not Started
File: Appendix U1.C.18.pdf
Appendix U1.D - King County Metro As-Built
Not Started
File: Appendix U1.D.pdf
Appendix U1.E.1. - King County Sewer Siphon Photos
Not Started
File: Appendix U1.E.1.pdf
Appendix U1.E.2. - King County Sewer Siphon As-Built
Not Started
File: Appendix U1.E.2.pdf
Appendix U1.F. - Puget Sound Energy Gas As-Built
Not Started
File: Appendix U1.F.pdf
Appendix U1.G - Seattle City Light Electrical As-Built
Not Started
File: Appendix U1.G.pdf
Appendix U1.H. - Seattle IT Fiber Optic As-Built
Not Started
File: Appendix U1.H.pdf
Appendix U1.I. - SPU 12-inch Distribution Main As-Built
Not Started
File: Appendix U1.I.pdf
Appendix U1.J. - SPU 54-inch Transmission Main As-Built
Not Started
File: Appendix U1.J.pdf
Appendix U2.A.1 - 108 Inch CSS CCTV Inspection
Not Started
File: Appendix U2.A.1.pdf
Appendix U2.A.2. - 108 Inch CSS CCTV Report
Not Started
File: Appendix U2.A.2.pdf
Appendix U2.B.1 - 114 Inch CSS CCTV Inspection
Not Started
File: Appendix U2.B.1.pdf
Appendix U2.B.2. - 114 Inch CSS CCTV Report
Not Started
File: Appendix U2.B.2.pdf
Appendix U2.C.1 - 42 Inch CSS CCTV Inspection
Not Started
File: Appendix U2.C.1.pdf
Appendix U2.C.2. - 42 Inch CSS CCTV Report
Not Started
File: Appendix U2.C.2.pdf
Appendix U2.D - CSS Water Line Potholing Locations
Not Started
File: Appendix U2.D.pdf
File: Appendix U2.D.pdf
Appendix U3.A - WSDOT Permit Franchise Database
Not Started
File: Appendix U3.A.pdf
Appendix U3.B - Utility Conflict Matrix
Not Started
File: Appendix U3.B.pdf
Appendix U4. - Utility Contact List
Not Started
File: Appendix U4.pdf
Appendix U5. - Utility Assignment of Rights
Not Started
File: Appendix U5.pdf
Appendix U6. - KCWTD Feasibility Study
Not Started
File: Appendix U6.pdf
Appendix U7. - SPU Feasibility Study
Not Started
File: Appendix U7.pdf
Appendix U8.A. - KCWTD Design-Build Agreement
Not Started
File: Appendix U8.A.pdf
Appendix U8.C. - Seattle City Light Design-Build Agreement
Not Started
File: Appendix U8.C.pdf
File: Appendix U8.C.pdf
Appendix U8.D. - SPU Design-Build Agreement
Not Started
File: Appendix U8.D.pdf
Appendix U8.E. - King County Metro Design-Build Agreement
Not Started
File: Appendix U8.E.pdf
Appendix U9.A. - Comcast MOU
Not Started
File: Appendix U9.A.pdf
Appendix U9.B - Puget Sound Energy MOU
Not Started
File: Appendix U9.B.pdf
Appendix U10.A - CenturyLink Franchise Permits
Not Started
File: Appendix U10.A.pdf
Appendix U10.B - Comcast Franchise Permits
Not Started
File: Appendix U10.B.pdf
Appendix U10.C - FreshChoice Franchise
Not Started
File: Appendix U10.C.pdf
Appendix U10.D - Integra Telecom Franchise Permits
Not Started
File: Appendix U10.D.pdf
Appendix U10.E - King County Metro Franchise Permits
Not Started
File: Appendix U10.E.pdf
Appendix U10.F - LTS 360 Networks Franchise Permits
Not Started
File: Appendix U10.F.pdf
Appendix U10.G. - PSE Franchise Permits
Not Started
File: Appendix U10.G.pdf
Appendix U10.G.1 - PSE 24th Ave Franchise
Not Started
File: Appendix U10.G.1.pdf
Appendix U10.H. - Seattle City Light Permits Franchises
Not Started
File: Appendix U10.H.pdf
Appendix U10.I. - Seattle DOT Franchise Permits
Not Started
File: Appendix U10.I.pdf
Appendix U10.J - SPU Franchise Permits
Not Started
File: Appendix U10.J.pdf
Appendix U10.K. - Sound Transit Franchise Permits
Not Started
File: Appendix U10.K.pdf
Appendix U10.L - Sprint Nextel Franchise Permits
Not Started
File: Appendix U10.L.pdf
Appendix U10.M - T-Mobile Permit UP17579
Not Started
File: Appendix U10.M.pdf
Appendix U10.N. - Traylor Frontier Kemper Permit
Not Started
File: Appendix U10.N.pdf
Appendix U10.O. - Verizon NW Franchise Permits
Not Started
File: Appendix U10.O.pdf
Appendix U10.P - XO Comm Franchise Permits
Not Started
File: Appendix U10.P.pdf
Appendix U11. - SPU Special Provisions
Not Started
File: Appendix U11.pdf
Appendix U12 - Sewer Line Min Cover Waterline Main
Not Started
File: Appendix U12.pdf
V - Quality Assurance (1 deliverables)
Appendix V2 - QMP Outline
Not Started
File: Appendix V2.pdf
X - Montlake Underlid Systems (10 deliverables)
Appendix X1.A. - FFFS Flammable Liquid Fires Study
Not Started
File: Appendix X1.A.pdf
File: Appendix X1.A.pdf
Appendix X1.B. - Montlake Underlid Fire Alarm Response
Not Started
File: Appendix X1.B.pdf
Appendix X2. - Montlake Underlid Emergency Response
Not Started
File: Appendix X2.pdf
Appendix X3.A. - Seattle Fire Concurrence Letter 1
Not Started
File: Appendix X3.A.pdf
Appendix X4. - Montlake Underlid Concept of Operations
Not Started
File: Appendix X4.pdf
Appendix X5.B. - Montlake Lid Egress Study
Not Started
File: Appendix X5.B.pdf
Appendix X5.C. - FLS Ventilation Corridor Study
Not Started
File: Appendix X5.C.pdf
Appendix X6. - Seattle NFPA 502 Amendments
Not Started
File: Appendix X6.pdf
Appendix X7. - WABN Emergency Response Plan
Not Started
File: Appendix X7.pdf
Y - Communications Plan (1 deliverables)
Appendix Y1. - SR 520 No Surprises Approach
Not Started
File: Appendix Y1.pdf
Z - Community Workforce Agreement (1 deliverables)
Appendix Z1. - Community Workforce Agreement
Reviewed
File: Appendix Z1.pdf
Notes: The Community Workforce Agreement contains only one completion-related requirement: notification to the Building Trades Council when Final Acceptance is received, including description of accepted work and punch list if applicable.
8. Design-Builder's Proposal Documents
0/1 reviewed (0%) | 1 not reviewed
Proposal (1 deliverables)
  • [5] Design-Builder's Proposal (3 volumes)
    Not Started
    Graham winning proposal